Project Information

Sanat Yapı has used the latest technologies that contribute to the productivity of the employees who have undertaken the turnkey construction of the facility.

Summary Information:

Location: Ataşehir/İstanbul TURKİYE

Type: Building

Work Performed: Structural work, fine construction, decoration, mechanical and electrical works

Square Meters: 6.000

Construction Time: 16 months

Construction Year: 2009

YOLBULAN METAL OFFICE BUILDING

The plaza with an area of ​​6.000 square meters consists of 7 floors and 3 basement floors.

The structure, which has a smart building infrastructure, brings the comfort of the employees to the top with its high-tech equipment.

The latest products of technology were used in the facade cladding, which was designed with environmentally friendly technologies, and aluminum sunshade panels were used.

There is a parking lot with a capacity of 39 vehicles in the project.